大神秦先生气质短发美女,秦先生九部短发视频大全,黑客家庭监控视频360


86-21-58999552

Better design better quality better solution

Mobile Power Transformer Test Systm

MPTTS Series

[Mobile Power Transformer Test System]

MPTTS Series Mobile Power Transformer Test System is design to test and diagnose in both single phase and three phase power transformer up to 500MVA. The system will perform the following tests in accordance with ANSI / IEEE C57.12.90 and IEC 76 latest edition standards.

Samgor offer the turn-key project of the MPTTS mobile power transformer test system mainly consists of the station design, type selection and purchase of special equipment, installation and commissioning, training of the testing personnel, etc.

Samgor has developed transformer test systems that offer the customer reliability and flexibility solution. By utilizing Programmable Logic Controllers (PLC) in the control system, the MPTTS series power transformer test system allows the customer the ability to add optional features or change the test sets operating procedures by reprogramming the PLC. This is much more cost effective than rewiring the test set as was required in traditional test?systems. Reliability is a top priority for Samgor. Craftsmanship and the use of top quality materials and components insure the customer years of reliable service from their transformer test system.

All test data are recorded automatically and the necessary?correction calculations according to ANSI C57 and IEC 60076 standards are performed automatically. The system calculates corrected losses, efficiency, regulation and percent impedance. Computer aided data acquisition is increasingly becoming the standard as customers demand computer generated reports that reduce operator error. The system features Microsoft Windows based testing software which builds a data base of transformer test results and creates accurate final test reports in Microsoft Office format. Setup maps for each test are provided to reduce costly connection mistakes.

Applications:

?? 500MVA and Below Power Transformer

Test Applications:

MPTTS transformer test systems are designed to perform transformer tests in accordance with ANSI C57 and IEC 60076 standards, latest edition. These tests include:

?? No Load Loss up to 500MVA Power Transformer

?? Load Loss up to 90MVA Power Transformer

?? Induce Voltage Test up to 500MVA Power Transformer

?? Temperature Rise / Heat Run Test up to 500MVA Power Transformer

?? Partial Discharge Measurement

主站蜘蛛池模板: 平乐县| 韶山市| 柳林县| 绵竹市| 城步| 延边| 休宁县| 德清县| 汉源县| 东至县| 孝感市| 恭城| 道真| 衡水市| 阿城市| 徐汇区| 松滋市| 贵港市| 十堰市| 马山县| 华宁县| 合山市| 临猗县| 凤山市| 浠水县| 瑞丽市| 天祝| 千阳县| 通州区| 庄浪县| 西华县| 瑞昌市| 西丰县| 清水河县| 苗栗县| 富宁县| 依兰县| 北票市| 白朗县| 灵石县| 聂拉木县|